1-46-7 Minami Ota, Minami-ku, Yokohama, Kanagawa 232-0006 Japan
TelePhone: +81-45-730-6311, Facsimile: +81-45-716-3831
(C)Copyright 2009-2013 Asia Kyodo-Sekkei Consultant Co,. Ltd. All right reserved.

Asia Kyodo-Sekkei Consultant Co., Ltd.
Consulting Engineers
Yokohama, Tokyo, Fukuoka  Japa
Field Survey, Review of Previous Studies and Preliminary Design, Detailed Design, Cost Estimation, Preparation of Pre-Qualification and Tender Documents including Technical Specification Requirements Pre-Qualification and Tender Documents including Technical Specification Requirements
(2) Scope of Work
(1) Summary
Bridge Length : 1,360 m
Type : Cast in Situ Continuous PC Box Girder Bridge supported by Riverse Circulation Bored Piles
The first Mekong River Bridge was constructed to boost trade in the country and improve links with Laos and Vietnam with funding from Japanese Government. The Bridge connects east and west Cambodia by road for the first time.

HOME | CORPORETE | BUSINESS | OVERSEA PROJECT |

Japanese
PROJECT DATA
 The Project for Construction of First Mekong Bridge (1996 〜 1997, Cambodia)