Asia Kyodo-Sekkei Consultant Co., Ltd.
Consulting Engineers
Yokohama, Tokyo, Fukuoka Japa
Field Survey, Review of Previous Studies and Preliminary Design, Detailed
Design, Cost Estimation, Preparation of Pre-Qualification and Tender Documents
including Technical Specification Requirements Pre-Qualification and Tender
Documents including Technical Specification Requirements
(2) Scope of Work
(1) Summary
Bridge Length |
: |
1,360 m |
Type |
: |
Cast in Situ Continuous PC Box Girder Bridge supported by Riverse Circulation
Bored Piles |
The first Mekong River Bridge was constructed to boost trade in the country
and improve links with Laos and Vietnam with funding from Japanese Government.
The Bridge connects east and west Cambodia by road for the first time.
PROJECT DATA
■ The Project for Construction of First Mekong Bridge (1996 〜 1997, Cambodia)