(1) Summary
Old Mangochi Bridge had 1-lane bridge with wooden slab which constrained the weight of vehicle accessible less than 7 tons. Mangochi Bridge was important bridge along the Malawi National Highway No.3, which could not correspond to traffic increase and thus hindered the economical development of Malawi.
Bridge Length : 220 m with 2 lanes
Super Structurepe : 3 Spans Continuous Cast in Situ PC Box Girder
Foundation    Bridge supported by Open Caisson Foundation
(2) Scope of Work
Field Survey, Review of Previous Studies and Preliminary Design, Detailed Design, Cost Estimation, Preparation of Pre-Qualification and Tender Documents including Technical Specification Requirements
Japanese
PROJECT DATA
 The Project for Construction of Replacement of Old Mangochi Bridge with
                      New Bridge (1997 〜 1998, Republic of Malawi)