1-46-7 Minami Ota, Minami-ku, Yokohama, Kanagawa 232-0006 Japan
TelePhone: +81-45-730-6311, Facsimile: +81-45-716-3831
(C)Copyright 2009-2013 Asia Kyodo-Sekkei Consultant Co,. Ltd. All right reserved.

New Bridge

Old Bridge

Asia Kyodo-Sekkei Consultant Co., Ltd.
Consulting Engineers
Yokohama, Tokyo, Fukuoka  Japan
HOME | CORPORETE | BUSINESS | OVERSEA PROJECT |

 The Project for Construction of King Hussein Bridge
       (1996 〜 1999, Hashemite Kingdom of Jordan)

(1) Summary
King Hussein Bridge is situated in the main road connecting Israel to the Palestinian Interim Self-Government Authority (West Bank) and was important to accommodate the traffic increase. Authority requested to the Government of Japan to replace with New Bridge.
Bridge Length : 90 m
Width : 12.1 m (2 lanes + one side sidewalk)
Type : Continuous Cast in Situ PC Box Girder Bridge
(2) Scope of Work
Field Survey, Review of Previous Studies and Preliminary Design, Detailed Design, Cost Estimation, Preparation of Pre-Qualification and Tender Documents including Technical Specification Requirements.
Japanese
PROJECT DATA